WOSEN LIGHTING TECHNOLOGY LIMITED

WOSEN LIGHTING TECHNOLOGY LIMITED

Dom> Blog> Analysis of the construction methods of solar street lamp foundation

Analysis of the construction methods of solar street lamp foundation

December 24, 2022

The construction staff may be obliged to question the unreasonable selection of the installation site and terminate the construction according to the construction site conditions, and report the situation to the relevant person in charge within the first time. The rectification is completed within a certain period of time, and the essential construction guidelines are followed. The size of the solar street lamp foundation map (confirmed by the construction staff) to excavate the pit along the road.

In the foundation, the upper surface of the buried cage must be ensured to be horizontal (select a level to perform measurement and detection), and the anchor bolts in the cage must be perpendicular to the upper surface of the foundation (select a square to perform measurement and detection); after the pit excavation is completed Place it for 1 ~ 2 days and inspect whether there is groundwater infiltration. If there is groundwater infiltration, the construction will be terminated immediately; before the construction, prepare the equipment required for the manufacture of solar street lamp foundation and select construction staff with construction experience.



Strictly abide by the solar street lamp foundation plan and select suitable cement. Where the soil has high acidity and alkali, unique acid and alkali resistant cement must be used; fine sand and stones must not have impurities such as soil that affect the strength of the concrete; the soil on the four sides of the foundation must be tamped.

The bottom of the tank where the battery compartment is placed in the foundation must be increased by 5 × Ф80 drainage holes or according to the drawings. Before construction, the two ends of the threading pipe must be blocked to prevent foreign objects from entering or congestion during or after construction, causing trouble in threading during installation or It cannot be threaded; after the foundation of the solar street lamp is manufactured, it needs to be maintained for 2 to 7 days (according to the sky condition); the solar street lamp foundation experience can be passed before the installation of the solar street lamp can be implemented.

The above content is provided by WOSEN. WOSEN is a professional manufacturer and supplier of Led Flood Light, Led Street Light, Led Solar Light, etc. For more information, please visit https://www.wosenled.com/ or contact admin@wosenled.com or WhatsApp +86-13425434349




Skontaktuj się z nami

Author:

Ms. Mandy

Phone/WhatsApp:

+8613425434349

Wszystkie produkty
You may also like
Related Categories

Wyślij je do tym dostawcy

Przedmiot:
Email:
wiadomość:

Your message must be betwwen 20-8000 characters

  • Wyślij zapytanie

Copyright © 2024 WOSEN LIGHTING TECHNOLOGY LIMITED All rights reserved.

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Wysłać