Solar street light installation method and how to install and construct

January 16, 2023

How to install solar street lights? Presumably there are still many people who don't understand. This article describes the installation method of solar street lights. Friends who don't know how to install solar street lights can understand the installation plan of solar street lights.


Composition of solar street lights 1. Composition and working principle of solar street lights

Solar street lights are mainly composed of solar panel components, intelligent controllers, battery packs, light sources, light poles and brackets.

Solar street lights use solar panels to convert solar radiation into electrical energy during the day and then store the electrical energy in the battery via an intelligent controller. When the night comes, the sun's light intensity gradually decreases. When the intelligent controller detects that the illuminance is reduced to a certain value, the battery is controlled to supply power to the light source load, whereby the light source automatically lights up when it is dark. The intelligent controller protects the charging and overdischarging of the battery, and controls the opening and lighting time of the light source.

First, foundation pouring

1 1. Establish the installation position of the street lamp: According to the construction drawings and the geological conditions of the survey site, the members of the Kaichuang photoelectric construction team will determine the installation position of the street lamp with the street lamp spacing of 40 meters as the reference value in the place where there is no sunshade at the top of the street lamp. Otherwise, it should be appropriate. Replace the street light installation location.

2 2. Excavation of street lamp foundation pit: Excavate the street lamp foundation pit at the fixed installation position of the street lamp. If the soil surface is soft, the depth of our excavation will be deepened. Identify and protect other facilities (such as cables, pipes, etc.) at the excavation location.

3 3. A battery box is built in the excavated foundation pit to embed the battery. If the pits we are digging are not wide enough, we will continue to dig wide enough to have enough space to accommodate the battery box.

4 4. Pour the street lamp foundation embedded parts: Place the pre-welded pre-welded parts of Kaichuang Optoelectronics into the pit in the pit of 1 m deep excavation, and place one end of the wire tube in the middle of the embedded part, and another Place one end to the buried battery. And keep the embedded parts, foundation and ground on the same level. The embedded parts are then fixed by C20 concrete. Stirring and symmetry during the pouring process to ensure the compactness and firmness of the entire embedded part.

5 5. After the construction is completed, the residue on the positioning plate should be cleaned in time, and wait until the concrete is completely solidified (about 4 days, if the weather is good for 3 days), then the solar street lamp can be installed.

Second, solar street light component installation

11, solar panel installation

1. Place the solar panel on the battery board bracket and screw it tightly to make it firm and reliable.

2. Connect the output line of the solar panel, pay attention to the positive and negative poles of the correct battery board, and tie the output line of the battery board with the cable tie.

3. After the wire is connected, tin the battery board wiring to prevent oxidation of the wire. Then put the wired battery board aside and wait for the thread to pass.

Solar street lamp installation method and how to install and construct

22, LED lighting installation

1. Pass the lamp wire out of the lamp arm and leave a light wire at the end of the lamp cap to install the lamp cap.

2. Support the pole, and pierce the other end of the lamp from the straight hole reserved by the pole, and follow the lamp to the end of the pole. And install the lamp head at the other end of the lamp line.

3. Align the lamp arm with the screw hole on the lamp post, and then tighten the lamp arm with a quick wrench. The light arm is tightened after visually observing the lamp arm without skew.

4. Mark the end of the light wire out of the top of the pole. Mark the two wires together with the solar panel wire to the bottom of the pole and fix the solar panel to the pole. Wait for the crane to lift after checking that the screws are tightened.

33, light pole lifting

1. Before lifting the pole, be sure to check the fixing of each component, and check if there is any deviation between the lamp cap and the panel, and make appropriate adjustments.

2. Put the sling in the proper position of the pole and slowly lift the luminaire. Avoid damage to the battery board by the crane wire rope.

3. When the pole is lifted directly above the foundation, slowly lower the pole, while rotating the pole, adjust the head to the road surface, and align the hole on the flange with the anchor bolt.

4. After the flange falls on the foundation, put on the flat pad, spring pad and nut in turn, and finally tighten the nut evenly with a wrench to fix the lamp post.

5. Remove the sling and check if the pole is tilted and adjust the pole.

44, battery and controller installation

1. Put the battery into the battery well and use a thin wire to thread the battery wire onto the roadbed.

2. Connect the cable to the controller according to the technical requirements; first connect the battery, then connect the load, then connect the solar panel; when wiring, be sure to pay attention to the wiring and the terminal marked on the controller can not be connected incorrectly, positive and negative poles Sex cannot collide and cannot be reversed; otherwise the controller will be damaged.

3. Whether the work of debugging the street lamp is normal; set the mode of the controller, let the street light light up, check if there is any problem, if there is no problem to set the lighting time, seal the lamp cover of the light pole.

4. Intelligent controller wiring effect diagram.

Third, solar street light component adjustment and secondary pre-burial

1. After the installation of the solar street light is completed, check the installation effect of the overall street light, and tilt and re-adjust the light pole. Eventually, the installed street lamps are completely uniform.

2. Check if there is any deviation in the solar angle of the panel. You need to adjust the panel to face in the positive direction. The specific direction is subject to the compass.

3. Stand at the center of the road and check if the lamp arm is skewed and the lamp is proper. If the lamp arm or the lamp head is not correct, it needs to be re-adjusted. (As shown below)

4. After all the installed street lamps are adjusted neatly and uniformly, after the lamp arm lamp head is not skewed, the lamp post base is pre-buried twice. Cementing the base of the pole to form a small square makes the solar street light more stable and reliable. (Second pre-buried as shown):

The above content is provided by WOSEN. WOSEN is a professional manufacturer and supplier of Led Flood Light, Led Street Light, Led Solar Light, etc. For more information, please visit https://www.wosenled.com/ or contact admin@wosenled.com or WhatsApp +86-13425434349

Skontaktuj się z nami

Author:

Ms. Mandy

Phone/WhatsApp:

+8613425434349

Wszystkie produkty
You may also like
Related Categories

Wyślij je do tym dostawcy

Przedmiot:
Email:
wiadomość:

Your message must be betwwen 20-8000 characters

  • Wyślij zapytanie

Copyright © 2024 WOSEN LIGHTING TECHNOLOGY LIMITED All rights reserved.

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Wysłać